Rhode Island Chronicle

Green Formwork System Improves Efficiency for Concrete Forming In Construction Job Site.

 Breaking News
  • No posts were found

Green Formwork System Improves Efficiency for Concrete Forming In Construction Job Site.

May 17
07:36 2022

With the development of concrete forming system, the traditional timber beam system with plywood could not meet the needs of construction contractors for an efficient and safe construction. In the developed countries especially in U.S.A., the slab concrete structures are usually designed into post tensioned slab or flat slab. And Green Formwork system is manufactured based on that.

Green formwork system’s performance in our job site is better than I thought! Actually it’s amazing!” said Arian, the project manager and technical director of Chip Mong Group, “After I used Green Formwork System, it helped me to save around 50% labour and 30% material cost, the installation speed could reach up to 100m2 per day, compared with Doka and Peri, the formwork price is only half of them.”

Adrian actually understand the green formwork after his first try in his site. Before he only believes that the traditional method to build with plywood, timber beam and shoring system is the best choice for him and his company.

Green Formwork System Introduction

Luriel Green Formwork System is an advance steel framing panel-prop formwork system which allows early striking operation. It provides a suitable formwork solution to most concrete structure and component and meets the general requirements of different construction methods and conditions. 

It allows fast as well as safe forming operations with a systematic assembly sequence. The low weight of the panels, compact dimensions and practical design of the system components facilitate non-tiring and ergonomic working operations.

​GREEN FORMWORK has been designed for standard use in constructing slabs with thicknesses up to 30 cm. GREEN FORMWORK ‘s range of applications extends from residential construction through to real estate construction projects.

​The systematic assembly sequence and lightweight system components  made of steel accelerate working  operations. In addition, the possibility of early stripping with the drophead  system reduces on-site material  requirements.

​With GREEN FORMWORK, infill areas are reduced  to an absolute minimum. Furthermore, the system makes a convincing case  with an extensive range of safety and  logistical accessories.

​A further advantage is the easy horizontal transportation of formwork materials as the small prop requirements ensure more freedom of movement  under the slab formwork.

Early Stripping/Striking Mechanism of Green Formwork System

“There’s a lot of improvement room for creativity within a single system like that,” Adrian continues, “with Early Stripping Mechanism, Now 1 set panel and 2 sets of the shoring system is more efficient, of course cheaper compared with the old method. I used to work with many concrete forming system, but green formwork is the most suitable in my company development plan. In other ways it didn’t cause any problems while our team is using the ringlock scaffolding system from my old supplier”

green formwork early stripping mechanism

With Green formwork early stripping mechanism, the concrete contractors can use only 1 set of panel + 2 sets of props/shoring system to cycle for the whole project which will save the cost on material compared with the traditional formwork with plywood.

​The six directions self-locking system ensures that the stability and safety, at the same time, the prop also provide the room for infill beam to meet the need of traditional formwork users in 12mm.

ONLY 3 Components​ of Green Formwork & Shoring System together with Infill accessories

 Green formwork

Formwork Panel/Formwork Shuttering Size is from 1.8m x 1.2 m to 0.6m x 0.6m

Well the Load capacity of the the Prop/Shoring System is from 37KN at the height of 2.3m to 20.1KN at the height of 3.5m with 2:1 safety factor.

For the area around the column wall where the Green formwork panel can’t reach, Adrian suggested the concrete contractor to use the traditional plywood with thickness 12mm.In this way, the one who stores the traditional formwork could still consume in the current or new project instead of material waste.

Conclusion

With the good features like, reducing the rubbish like plywood cutting, there is no need to cut the panel of the green formwork system. More convenient for cleaning the site, and save 50% labour in a quite efficient and improve & boost the construction schedule. Green formwork system is stepping forward aiming to become the builder of all civilizations. 

Media Contact
Company Name: Luriel Shen Hien Green Formwork System
Contact Person: Nick Sun
Email: Send Email
Phone: +8615166012761
Address:Room 3003, Wanke feicui Binjiang phase I, Huanhu Road, Guandu District
City: Kunming City
Country: China
Website: https://www.ynlysh.com/green-formwork-system

Categories